Skip to content

Our Work

Recent Projects from Our Battle Creek Shops

Plumbing, heating and cooling work from A.W. Crooks and The Plumbing Company, in Battle Creek and the surrounding areas.

The Construction Trades Company logo

Recent projects

Recent jobs from Battle Creek and the surrounding areas.

Each project is a real job. The city and the type of work are on the card.

New Lochinvar Solution commercial Boiler and flue, installed by The Plumbing Company for Morgan Properties
Front of the new commercial Boiler installed by The Plumbing Company for Morgan Properties
New copper piping and valves at the commercial Boiler
Copper piping and a Watts valve on the commercial Boiler install
Copper joints and fittings on the commercial Boiler piping
Circulator pumps on the commercial Boiler piping

Boiler

The Plumbing Company

Commercial Boiler Install, Morgan Properties

Drain Pipe fittings staged for the Pfizer Building 89 Floor Drain replacement in Portage, by The Plumbing Company
New Floor Drain fitting set in the slab at Pfizer Building 89 in Portage
Underground Drain Pipe in an excavated trench at Pfizer Building 89 in Portage
Coupled Drain Pipe fittings in the excavation at Pfizer Building 89 in Portage
Drain Pipe run along the wall in the excavation at Pfizer Building 89 in Portage
Opened floor with existing Drain Pipe in the trench at Pfizer Building 89 in Portage
Vertical Drain Pipe assembly at Pfizer Building 89 in Portage
Underground Drain Pipe laid in the trench at Pfizer Building 89 in Portage
Drain Pipe and fittings in an open pit at Pfizer Building 89 in Portage
Floor opening with Drain Pipe below at Pfizer Building 89 in Portage
Floor Drain opening at the slab edge at Pfizer Building 89 in Portage
Floor Drain and Drain Pipe in an open pit at Pfizer Building 89 in Portage
Coupled Drain Pipe in the pit at Pfizer Building 89 in Portage
Open pit with Drain work underway at Pfizer Building 89 in Portage
Installed Drain Pipe and Floor Drain grate at Pfizer Building 89 in Portage
Drain Pipe in a floor opening at Pfizer Building 89 in Portage
Coupled Drain Pipe in the trench at Pfizer Building 89 in Portage
Drain Pipe in an excavated pit at Pfizer Building 89 in Portage
Drain Pipe tee in the slab opening at Pfizer Building 89 in Portage
Coupled Drain Pipe with a level in the trench at Pfizer Building 89 in Portage
Drain Pipe passing through a floor opening at Pfizer Building 89 in Portage
Open trench with Drain Pipe at Pfizer Building 89 in Portage
Outdoor excavation for Drain work at Pfizer Building 89 in Portage
Long trench with new Drain Pipe at Pfizer Building 89 in Portage
Open trench along the slab at Pfizer Building 89 in Portage
Excavated trench for Drain Pipe replacement at Pfizer Building 89 in Portage
Drain Pipe in an excavated pit at Pfizer Building 89 in Portage

Portage

Underground

The Plumbing Company

Pfizer Building 89 Drain Pipe and Floor Drain Replacement

Deep excavation for a storm structure tie-in at Haven of Rest in Battle Creek, by The Plumbing Company
Storm structure wall with a Pipe penetration at Haven of Rest in Battle Creek
Storm structure with the grate installed at Haven of Rest in Battle Creek

Battle Creek

Underground

The Plumbing Company

Haven of Rest

Basement ceiling main Drain PVC Rough-in on joists at Royal Swine, by The Plumbing Company
DWV Pipe and Floor Drain stub-ups during the basement Rough-in at Royal Swine
PVC Drain with PEX water line in a joist bay at Royal Swine
Drain and Vent runs through floor joists at Royal Swine
Overhead Drain tee and PEX lines at Royal Swine
Vent and Drain branch with PEX in the joists at Royal Swine
Main Drain line in a joist bay at Royal Swine
Overhead Rough-in Drains at Royal Swine
Wall-hung Sink set during Trim-out at Royal Swine
Toilet installed during Trim-out at Royal Swine
Sink with faucet installed during Trim-out at Royal Swine

Rough-in and Trim

The Plumbing Company

Royal Swine Rough-in and Trim-out

Rough PVC Drain run along a wall at Native Leaf 2 in New Buffalo, by The Plumbing Company
Wall-hung Sink installed at Native Leaf 2 in New Buffalo
Toilet set in a restroom at Native Leaf 2 in New Buffalo
Utility Sink with faucet and Drain piping at Native Leaf 2 in New Buffalo

New Buffalo

Rough-in and Trim

The Plumbing Company

Native Leaf 2

Double drinking fountain mounted at Oasis Wellness in New Buffalo, by The Plumbing Company
Under-sink P-trap and Drain on a double Sink at Oasis Wellness in New Buffalo

New Buffalo

Trim

The Plumbing Company

Oasis Wellness

Underground Drain and water line in a trench at Arbogast in Battle Creek, by The Plumbing Company
Slab-area Drain lines and stub-ups in the excavated trench at Arbogast in Battle Creek
Underground Drain and water line layout before backfill at Arbogast in Battle Creek

Battle Creek

Underground

The Plumbing Company

Arbogast

Tempstar Furnace Installation by A.W. Crooks

Battle Creek, October 2026

Furnace

A.W. Crooks

Tempstar Furnace Installation, Battle Creek

Rust stained water in a utility sink, then clear water after the new Water Softener and iron filtration system by A.W. Crooks Plumbing, Heating & Cooling
Old water treatment equipment beside the new Water Softener and iron filtration system installed by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Water Softener

A.W. Crooks

Water Softener and Iron Filtration Install

Rust stained water was showing up in every fixture. We installed a new Water Softener and iron filtration system, and the water now runs clear.

New air conditioning condenser set beside a brick home

Battle Creek, September 2026

Air Conditioning

A.W. Crooks

A/C Condenser Replacement

We replaced the outdoor air conditioning condenser at this Battle Creek home and set the new unit beside the house. Only the condenser was swapped, so the rest of the existing system stayed in place.

Rinnai Tankless Water Heater on a stone basement wall with white vent piping and copper lines
Side view of the Rinnai Tankless Water Heater and its piping on the basement wall

Albion, April 2026

Water Heater

A.W. Crooks

Rinnai Tankless Water Heater

We installed a new Rinnai Tankless Water Heater on the basement wall, with exterior venting and copper hard piping. We also replaced the gas line to the heater as part of the job.

Rinnai I-Series combi Boiler installed by A.W. Crooks
Angled view of Rinnai I-Series combi Boiler installed by A.W. Crooks
Rinnai combi Boiler installed with new copper piping, circulator and expansion tank

Battle Creek, September 2026

Boiler

A.W. Crooks

Rinnai I-Series Combi Boiler Install

For a home heated by a Boiler, we installed a Rinnai I-Series combi that handles both home heat and endless hot water from one wall-mounted unit. It's about 95% efficient, has no tank, runs from an app, and is ready for a recirculation pump.

Failing cast iron drain line before replacement
New PVC drain line installed by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Drain

A.W. Crooks

Cast Iron Drain Replacement

We replaced a failing cast iron drain line with new PVC.

Fujitsu mini split outdoor unit mounted on a metal stand outside the office
Wall-mounted Fujitsu mini split indoor head in the office

Lansing, July 2026

Mini Split

A.W. Crooks

Fujitsu Mini Split Installation

We installed a Fujitsu 12,000 BTU multi-zone mini split system in an office, with two wall-mounted indoor heads served by one outdoor unit on a stand. The outdoor unit and both indoor heads are running well.

Rinnai on-demand Tankless Water Heater installed by A.W. Crooks

Battle Creek, October 2026

Water Heater

A.W. Crooks

On Demand Tankless Water Heater, Battle Creek

Toilet reset on a new flange by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Toilet

A.W. Crooks

Toilet Flange Repair and Reset

This toilet had been shimmed to keep it steady, and the constant rocking broke the seal and caused a leak. We replaced the flange and reset the toilet so it sits solid and sealed.

New Standby Generator on a pad beside the home
Standby Generator on its pad next to the siding and window of the home

Battle Creek, August 2026

Generator

A.W. Crooks

Standby Generator Install

We installed a new Standby Generator on a pad beside the home. After the install we tested it, and it runs with no issues.

New A.O. Smith 80 gallon commercial Water Heater before install
A.O. Smith 80 gallon natural gas Water Heater installed with new copper piping in an apartment complex

Lansing, August 2026

Water Heater

A.W. Crooks

Commercial Water Heater Install

We installed a new A.O. Smith 80 gallon natural gas Water Heater, rated at 199,000 BTU, for an apartment complex.

Old cast iron laundry drain beside the new utility tub, drain pump and PVC drain line by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Drain

A.W. Crooks

Utility Tub and Laundry Drain Replacement

We replaced an aging cast iron laundry drain with a new utility tub, drain pump and PVC drain line.

Mini split outdoor unit on a stand beside the home
Mini split indoor head mounted on the wall above a window

Battle Creek, August 2026

Mini Split

A.W. Crooks

Mini Split Installation

We installed a mini split system with three indoor heads and an outdoor unit on a stand. Every unit was tested and is working with no issues or leaks.

Kitchen sink drain before and after the new P-trap and disposal tie-in by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Drain

A.W. Crooks

Kitchen Sink Drain Replacement

Cluttered kitchen sink drain replaced with a clean new P-trap and disposal tie-in.

Charger Water Softener installed by A.W. Crooks

Battle Creek, October 2026

Water Softener

A.W. Crooks

Water Softener Installation, Battle Creek

Overhead PVC drain run in a commercial space by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Commercial Plumbing

A.W. Crooks

Commercial Overhead PVC Drain

Commercial overhead PVC drain run.

New toilet flange and the new toilet set by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Toilet

A.W. Crooks

New Toilet and Flange

New flange and new toilet, set right the first time.

Old bathroom sink trap before replacement
New bathroom sink trap installed by A.W. Crooks Plumbing, Heating & Cooling

Jackson, MI

Plumbing

A.W. Crooks

Sink Trap Replacement

A tired bathroom sink trap replaced with clean new PVC.

Photo grid

More Photos From Recent Jobs

Wall-mounted Tankless Water Heater with new venting and gas piping, installed by A.W. Crooks
Wall-mounted combi Boiler with venting and copper piping, installed by A.W. Crooks
Commercial Boiler with a new control system and flue
Standby Generator on its pad outside a home
New white PVC drain and waste piping with a cleanout in a basement
Basement Furnace with flue and wiring during service
Sewer Camera monitor showing the inside of a drain pipe
Washing machine boxes with water supplies and drain standpipes installed on a wall
Underground drain rough-in with PVC stub-ups and cleanouts before a new slab
Tree root pulled from a sewer line, lying on the ground beside the dig
PVC drain, waste and vent piping run along basement ceiling joists
Concrete patched over a repaired floor drain line

Ready when you are

Need this kind of work at your place?

Call us. We will get the right shop on it and explain the options and the price before the work starts.